Latest updates

Concept design for Stage 1 of The Crest

Camden Council is focused on delivering staged works identified in the Open Space Master Plan for The Crest, Gledswood Hills.

The Crest Open Space Master Plan was adopted by Council in 2021 following consultation with residents and other stakeholders. At the time Council committed to further developing a detailed design of the proposed Stage 1 works.

The overall Master Plan has been broken into smaller stages to allow Council to best manage the development of the site. The delivery of Stage 1A will be the first to be delivered, with future stages to be developed in line with the master plan the Master Plan.

Stage 1A works will consist of:

  • bicycle adventure course incorporating learn to ride components,
  • car park,
  • shared pathway network,
  • shelters,
  • seating and
  • landscaping works.

These works are proposed to be completed in 2024.


Did we get it right?

View the proposed design for Stage 1

  • Download the proposed Stage 1A concept design or read the associated reports and plans in the Document Library
  • Visit Council's Administration Building in Oran Park to look through copies which can also be found in the Camden, Narellan and Oran Park libraries.
Learn more
  • Join us at a drop-in session on Wednesday 27 September 2023 between 3.30pm and 5.30pm to take a look at large scale plans and learn more about the site proposal. We will be located in the open space on Serenity Circuit, Gledswood Hills.
  • Contact Council’s Sport and Recreation Planning Team on 13 Camden (13 226 336).

Share your thoughts

If you would like to comment on the plan, please make a submission between 15 September and 2 October 2023.

Submissions can be:

  • shared at the drop-in session (see above),
  • completed using the online submission form (below) ↓
  • hand delivered during business hours to our Administration Building, 70 Central Avenue, Oran Park NSW 2570
  • posted to Camden Council, PO Box 183, Camden NSW 2570
  • sent via email to mail@camden.nsw.gov.au

The Site

The Crest at Gledswood Hills is a 48ha parcel of land located within The Crest estate developed by MIRVAC.

The subject land is shown below.

Stage 1A is located off Gledswood Hills Drive, Gledswood Hills.

The Crest Open Space Stage 1 Plan

Slide the arrow to see the large-scale masterplan and the area which is to be delivered as Stage 1A

Complete Masterplan for Stage 1 of The Crest: Complete Masterplan for The Crest Stage 1A: Section 1A to be completed

The detail

Sample features

Learn more

We're keen to help you understand the proposed plan.

Check out the answers we've provided to Frequently Asked Questions below or ask us a question.

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

Sport and Recreation Team

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found

Make a Submission

Submissions must be received by 5pm Monday 2 October 2023.